All West Business Park 6415-75 Street
For Lease Market - Industrial
APPROXIMATELY 84,000 SQ.FT FACILITY ON 17.60 ACRES OF LAND
Available immediately – 1,800 Sq. Ft to 45,000 Sq. Ft with excess yard
heavy cranes and power
20′ DOORS
PROPERTY INFORMATION
MUNICIPAL ADDRESS: 6415-75 Street, Edmonton, AB
SIZE: Up to 8 Acres available with buildings
SITE SIZE: 17.60 Acres
ZONING: IH (Heavy Industrial)
CEILING HEIGHT: Various
LOADING: Grade
POWER: Heavy Industrial
CRANES: Various
PARKING: Ample
POSSESSION: immediate
OP.COSTS: $5.50/Sq. Ft (2022 est.)
BUILDING BREAKDOWN
BUILDING “A” LEASED
5,400 Sq. Ft.
30′ clear ceilings
(2) 16′ x 20′ Grade
Cranes (2) 10 ton, (1) 20 ton
Outdoor crane run
LEASE RATES: $10.50/Sq. Ft.
BUILDING “B” Brochure
2,400 Sq. Ft (+/-)
16′ clear ceilings
(1) 10′ x 12′ grade door
Small fenced yard
LEASE RATES: $10.00/Sq. Ft.
BUILDING “C” LEASED
2,000 Sq. Ft (+/-)
3 Ton Crane
1 Grade Door
LEASE RATES: $13.50/Sq. Ft.
BUILDING “D” LEASED
8,600 Sq. Ft (+/-)
24’clear ceilings
(2) grade 16′ x 20′ drive through
(1) 10 ton crane
LEASE RATES: Market
BUILDING “E” LEASED
9,929 Sq. Ft (+/-)
22′ clear ceilings
3 grade doors
(6) 6.3 ton cranes
Outdoor crane run
30+ welding stations
LEASE RATES: $8.50/Sq. Ft
BUILDING “F” Brochure
11,000 Sq. Ft. (+/-)
17.60 Acres (+/-)
(1) 10-ton bridge crane
(1) 20-ton bridge crane
Heavy power
LEASE RATES: $8.75/Sq. Ft.
BUILDING “G”
3,000 Sq. Ft (+/-)
16′ clear ceilings
Drive-thru bay
(2) 12’x12′ doors
Comes with small compound
LEASE RATES: $13.00/Sq. Ft
BUILDING “H” LEASED
3,000 Sq. Ft (+/-)
16’clear ceilings
(1) 16′ x 20′ grade door
Infrared heating
6,000 Sq. Ft fenced yard with shop
LEASE RATES: Market
BUILDING “I” LEASED
1,700 Sq. Ft (+/-)
16’clear ceilings
(1) 12′ x 12′ grade door
Crane
O/H heating
6,000 Sq. Ft (or more) fenced yard with shop
LEASE RATES: Market
LOCATION HIGHLIGHTS
Conveniently located in Davies Industrial Park
Excellent Southeast Edmonton location with close proximity to 75th Street, Argyll Road, Roper Road, and Whitemud Freeway
Service by multiple transit routes and new LRT station under construction immediately across the 75 Street.

